All updates
SnowManagerv2026.11.10

Subcontractor visibility: handoff notices, drawing controls and upcoming-address views

This release gives contractors clearer control over their subcontractors and makes upcoming work easier to spot across your maps and lists.

New

  • Subcontractors are now notified in the app and by email, in their own language, when they lose an address they had accepted — for example when they're taken off an address or when the address or its customer is deactivated or deleted. If several addresses are lost at once they arrive as a single message, and planned deactivations include the effective date.
  • Contractors can now switch off a subcontractor's permission to create drawings. When turned off, the subcontractor can't add new drawings (by drawing, duplicating, importing a file or using AI import) or change existing ones on your addresses, though previously created drawings stay visible. The restriction follows the address down the chain, and the subcontractor can see the setting and the reason in place of the New drawing button.
  • The Locations tab in a subcontractor's sidebar now opens with a map showing the addresses you assigned as pins over your zones, with a per-zone breakdown and an "Outside zones" group. Click a zone to filter the list and map; a new search box above the list finds addresses by name, street, postcode, city, customer or property ID.

Improved

  • Addresses that haven't started yet but have a start date ahead are now shown alongside active ones — in the Locations list, the customer sidebar, the zone map and the route map — each marked with its start date, so upcoming work no longer looks like it's missing. These addresses still can't be dispatched before their start date.
  • The "Assigned locations" count in the subcontractors table (and on a contractor's sidebar) now counts only addresses that are active or about to start, matching what the Locations tab shows before "Show inactive" is enabled.

Fixed

  • Subcontractors on the Free plan can now choose their own subcontractor and set what that subcontractor is paid directly from an assigned address, instead of being incorrectly shown an upgrade prompt. Addresses a Free business owns itself remain read-only as before.
  • Taking a subcontractor off an address now clears the unfinished work more reliably: reassigning an address through an import, removing a subcontractor, or withdrawing an invitation now also removes it from open stops, zones and routes — including for any businesses it had passed the address on to — while completed work is left untouched.